Tollesbury School - TCP Decarbonising Project
In late 2022 Tollesbury Climate Partnership (TCP) developed a plan to drastically reduce the carbon emissions from Tollesbury School. The basic plan was to replace the school’s oil boilers with low carbon, high efficiency heat pumps, improve the insulation of the school to reduce its energy demand and install solar panels to reduce overall electricity consumption.
The background to this project was that in 2022 TCP had been awarded funding from Maldon District Council to develop the business case for social investment into the local community. Separately, Tollesbury School, in partnership with TCP, had been awarded funding from Essex County Council for community engagement in decarbonisation, including the potential for a community-led project to decarbonise the school. This enabled us to commission detailed studies of the requirements for fabric improvements and low-carbon heating systems at Tollesbury School.
During late 2023 and 2024 very significant works were undertaken at the school, often outside of school hours. Additional roof insulation, double glazing and secondary glazing were installed to reduce heat loss from the school. Lighting throughout the school was upgraded to LED. The existing radiators and pipework were stripped out and replaced with new radiators designed to operate with the lower temperatures associated with a heat pump. Drilling of thirteen 180 metre deep boreholes occurred on the school playing fields in July / August 2024 and the new ground source heat pump installed and commissioned in late summer. Solar PV panels capable of producing a peak of 68 kW were installed on the school playing field in September and are now feeding green electricity into the school.
If you would like to find our more about the school project or TCP in general then contact hello@tollesburyclimate.org